3 Temple Gardens Redevelopment Project

 

The City of London has granted Planning and Listed Building Consent for the Inn to refurbish and redevelop 3 Temple Gardens for full commercial use.

Work is expected to start on the Grade II listed building in late summer/early autumn 2027 and conclude within 18-24 months.

Built in 1878, 3 Temple Gardens was designed in the French Renaissance chateau style by architect Edward Middleton Barry.  The building’s Grade II-listed status derives from a number of allegorical carvings and insignia, illustrating its longstanding function as legal chambers, as well as surviving original fixtures, such as heavy metal safes and fireplaces, reflecting how the building would have been used in the 19th century.

As a part-residential building above the minimum height, the building is classed as a Higher-Risk Building (HRB).  This project will see the building’s declassification from the HRB register and redevelopment into wholly commercial use from ground to sixth floor.  Talks are already in progression with a prospective tenant.

As part of the approved scheme, a new welcome reception will be created on the ground floor.  Inclusivity and accessibility also form a core part of the development, with two new passenger lifts serving all floors – in accordance with the London Plan – and refurbished washrooms and showers throughout the building.

A significant programme of restoration works will also be completed, including conservation of the 185 sash windows and repairing lath & plaster ceilings, plaster cornices and inscribed skirting boards.

Historic fabric will be retained throughout, where possible.  As part of the planning submission, an audit by specialist consultants Material Index found that 91% of the building’s existing material mass will be retained and 96.5% of all existing materials will be diverted from landfill through reuse or recycling.

Operational energy efficiency will also be increased through the removal of gas from the buildings, the installation of water source heat pumps, the transition to electric heating, and roof insulation improvements.  Together, these measures will support the building in meeting the Government’s minimum energy performance standards of EPC C by 2027 and EPC B by 2031.

The proposed scheme will address statutory compliance, improve the building’s usability, performance and specification, and provide modern commercial facilities. The building’s character and architectural interested will be preserved, adding a new chapter to Middle Temple’s historic estate.

For any further information, please contact Kat Cary or Roddy Houston in the Estates Office.

“EPC”    =    Energy Performance Certificate.  Over and above existing Minimum Energy Efficiency Standards (MEES) already in place, the UK government has indicated its intent to legislate to require all commercial buildings to be EPC B or above by 2031, unless exempt

 

Barry's design for 1-3 Temple Gardens published in The Builder 1879Drone survey May 2025 1, 2 and 3 Temple Gardens